onlyheli Posted December 28, 2009 Report Share Posted December 28, 2009 I have to install a Paravion bleed heater in a jetranger, and was wondering how long it will take. (Boss wants to know!) Quote Link to comment Share on other sites More sharing options...
wcobra Posted December 28, 2009 Report Share Posted December 28, 2009 I have to install a Paravion bleed heater in a jetranger, and was wondering how long it will take. (Boss wants to know!) That depends on how good you are Funny how this comes up once the cold finally hits, rather than when it's still not too bad out eh? On the serious side now, the basic kit in the hands of a capable AME and a good "AME in training" (sometimes referred to as an apprentice) should be able to be installed inside of two full days, as long as the boss isn't stopping by every 30 minutes to ask "how's it going eh?" Add up to another day if you're installing the de-misters too. Add two more days if you're working in the snowbank with Herman. Not a bad kit...Have fun! Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.